Nasci Construction

NASCI Catchbasin and Manhole

Machine and Hand excavation to expose surrounding manhole and or catch basin Repair, Removal and/or replace catch basin frame and cover.

  • Brick Reconstruction where needed

  • Riser Replacement

  • Tile Repair

  • Polymer reinforced parge repair

 

 

 

 

 

 

 

  • 6' cutting width

  • Approx. 10 min cutting time with little traffic disruption

  • Chimney rebuild includes Poly Ipex risers to absorb traffic impact

  • Average total repair time with 2 lifts of compacted asphalt is 2 hrs per manhole